* TUNUS/TOZEUR-SIDI BOUZID SS- PRIMARY ELECTRICITY AND CONSTRUCTION PROJECTS / HICC HEAVY INDUSTRY & CONSTRUCTION CO.
* PAZARCIK SS / PRIMARY ELECTRICITY AND CONSTRUCTION PROJECTS / GİRİŞİM ELECTRICITY
* FEVZİPAŞA SS / PRIMARY ELECTRICITY AND CONSTRUCTION PROJECTS / EUROPOWER ENERGY
* ANKARA UNIVERSITY SPP/ LICENSE PROCESS CONSULTANCY / GİRİŞİM ELECTRICITY
* ERGANİ-KARAKÖPRÜ SPP / LICENSE PROCESS CONSULTANCY / BEŞTEPE-LİMAK
* KÜTAHYA CEYLAN SPP/ LICENSE PROCESS CONSULTANCY / GİRİŞİM ELECTRICITY

* UYGAR WPP/ LICENSE PROCESS CONSULTANCY / ENERJİSA
* KÖKSALAN SPP / PREPARATION OF ROAD AND DRAINAGE PROJECTS / GİRİŞİM ELECTRICITY
* ETİ BAKIR/ ALL PRIMARY-CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS OF 3 SUBSTATION /AGON ENERGY
* TEMELLİ HOUSING PROJECT / PROJECT DESIGN AND LICENSE APPROVAL PROCESS / LEYLA ÖZGEN
* KONYA 9TH REGION 10 SUBSTATIONS / FIRE PROTECTION PROJECT PREPARATION WORK / FIBER ENGINEERING & ZERKON CONCRETE CONSORTIUM
* ADANA 18TH REGION 10 SUBSTATIONS / FIRE PROTECTION PROJECT PREPARATION WORK / FIBER ENGINEERING & ZERKON CONCRETE CONSORTIUM

* 154kV GÜLÜMUŞAĞI RES SS / POWER TRANSMISSION LINE AND PROJECT SERVICE / TUNNA ENERGY

* 380kV ATLAS GIS / TURN-KEY CONSTRUCTION INSTALLATION AND ENGINEERING. WORKS / ABB-TR AND ABB-CH
* 66/20kV SYRIA STEEL SUBSTATION / ENG. ENGINEERING SERVICES / HEMISHO COMPANY
* 154kV BAĞIŞTAŞ DAM and HEPP SS / TURN-KEY CONSTRUCTION WORKS / IC HOLDING
* 154kV YENİDERE SS / TURN-KEY CONSTRUCTION. and STEEL CONST. WORKS / HABBOUSH GROUP
* AFRICA GHANA WHEAT MILL PROJECT / OLAM FLOUR MILL REINFORCED CONCRETE PROJECTS OLAM GHANA-ALAPALA-TEFIROM
* 154kV KEMALİYE GPP / TURN-KEY CONSTRUCTION WORKS / ENERGEO
* 154kV FIRAT PLASTIC SS / TURN-KEY CONSTRUCTION AND ENGINEERING. WORKS / ABB
* 110/10kV KOSOVO - PRISHTINA-7 SUBSTATION / SS. TENDER PREPARATION ELTEM ENGINEERING
* 380kV ADULARYA SS / PRIMARY and STEEL CONST. ACCOUNTS / ABB-TR ABB-CZ
* SYRIA QATTINAH PILOT PROJECT WIND PARK / TURNKEY CONSTRUCTION. EXPLORATION AND PREPARATION OF PRELIMINARY PROJECTS / VESTAS – TEFIROM
* 154kV HARMANLIK RES/TURN-KEY CONSTRUCTION. and STEEL CONST. WORKS / ABB
* 154kV MUT WPP / TURNKEY CONSTRUCTION. and STEEL CONST. WORKS / ABB
* KARDEMİR MV CLOSED SWITCH BUILDING / PRIMARY CALCULATIONS and PROJECTS / ABB
* 380kV ANTALYA FREE ZONE. / CONSTRUCTION and PRIMARY ELECTRICITY PROJECTS / ŞA-RA
* 154kV ERYAMAN GIS / CONSTRUCTION and PRIMARY ELECTRICITY PROJECTS / BEST A.Ş.
* 154kV KAYSERİ GIS / CONSTRUCTION and PRIMARY ELECTRICITY PROJECTS / BEST A.Ş.
* 154kV VAN SS / CONSTRUCTION PROJECTS / AREVA – USLUEL
* TURN-KEY CONSTRUCTION WORKS FOR 154kV BÜYÜKÇEKMECE TM / LINE FEEDER ADDITION / ABB
* 380/154kV KAYABAŞI TM / TURNKEY ALL CONSTRUCTION. AND STEEL CONST. OPERATION HK ENERGY - MASAT ENERGY
* 132kV TEKNECİK SS (TRNC) / PRIMARY ELECTRICITY AND CONSTRUCTION PROJECTS/ŞA-RA
* 380/154kV BAŞKALE TM/CONSTRUCTION, PRIMARY AND STEEL PROJECT. DONE / ELTEM ENGINEERING
* PRIVATE VILLA / TURN-KEY CONSTRUCTION. WORKS / İMECE PREFABRICATED
*DR. SAMİ ULUS EDUCATION. AND RESEARCH. SICK. / STEEL CONST. TUBE PASSAGE TECHNICAL SPECIFICATIONS and APPROXIMATE COST ANALYSIS / DR. SAMİ ULUS EDUCATION. AND RESEARCH. SICK.
* 154kV KANGAL THERMAL POWER PLANT / CONSTRUCTION. ELECTRICAL INSTALLATION - TESTING COMMISSIONING LANDSCAPING WORKS / PADD LTD.
* 154kV FEKE HAVZA TM/LINE FEEDER ADDITIONAL SWITCH TEST. SECONDARY AND TDA PROCESS. / ABB
* 154kV OYKA SS / TURNKEY CONSTRUCTION. AND STEEL CONST. WORKS / IŞIN ELECTROMECHANICAL
* 600 MVA BACK TO BACK VAN CONVERTER STATION / ALL PRIMARY-CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS / ŞA-RA ENERGY
* 380/154/33 kV BURSA EASTERN GIS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / GE POWER
* 154 kV BAHRİBABA GIS / ALL CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / GE POWER
* 380/154/33 kV KEBAN SALT - II SUBSTATION / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / ŞA-RA ENERGY
* 380/154 kV TAŞOLUK GIS SUBSTATION / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / GÜNGÖR ELECTRICITY
* 154 kV GİRESUN SUBSTATION / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / GÜNGÖR ELECTRICITY
* 154 kV GAZİ OSMAN PAŞA RES TM / WIND PARK PROJECTS-SWITCHYARD PROJECTS / KAVELSAN ENERGY
* 400/132/11 kV BISMAYAH SWITCHYARD / ALL STEEL PROJECTS AND STEEL CALCULATIONS / ROK ENERGY
* 154 kV HASANAĞA SUBSTATION / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / MEMSAN ENERGY
* 154 kV TUNCELI SUBSTATION / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / SELÇUK ALBAYRAK
* 154 kV İZMİR HAVZA SUBSTATION / ALL CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS / BEST ELECTRICITY
* 220/110 kV PORT SUDAN SWITCHYARD / ALL STEEL PROJECTS AND STEEL ACCOUNTS / KONTROLMATIC ENERGY
* 154 kV GÜZYURDU HAVZA SUBSTATION / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / EMTA ENERGY
* 154 kV SELIMİYE GIS SUBSTATION / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / EMTA ENERGY
* 154 kV DEMİRCİ SUBSTATION / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / MUSTAFA TÜRKMEN-METİS ENERGY
* İZMİR 3RD REGION UNIVERSITY AND KARŞIYAKA GIS SUBSTATION / PREPARATION OF FIRE PROTECTION PROJECTS / TEİAŞ
* 380 kV HUNUTLU TES GIS / SYSTEM CONNECTION PROJECT WORKS / MTB ENERGY
* 400 kV TOSÇELİK GIS / PROJECT CONSTRUCTION WORKS / ABB
* TYPE WAREHOUSE BUILDINGS / PROJECT CONSTRUCTION WORKS / TEİAŞ
* ALPASLAN-1 HEPP / NEW SWITCHYARD PROJECT CONSULTANCY SERVICES / EÜAŞ
* 8TH REGION MULTI-PURPOSE WAREHOUSE BUILDING / PROJECT CONSTRUCTION WORKS / TEİAŞ
* GÖLBAŞI WAREHOUSE BUILDINGS / PROJECT CONSTRUCTION WORKS / TEİAŞ
* 154 kV NITROGEN SUBSTATION / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / MUSTAFA TÜRKMEN-METİS ENERGY
* 154 kV TAŞLICA SUBSTATION / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / MUSTAFA TÜRKMEN-METİS ENERGY
* 154 kV KEMERBURGAZ WPP SUBSTATION / ALL PRIMARY-CONSTRUCTION-STEEL AND WIND PARK PROJECT CONSTRUCTION WORKS / LODOS ENERGY
* VILLA PROJECT / ALL PROJECTS AND CONSTRUCTION WORKS / RECEP AKYEL
* TYPE WORKSHOP BUILDINGS / PROJECT CONSTRUCTION WORKS / TEİAŞ
* GÖLBAŞI TEK MOSQUE / PROJECT CONSTRUCTION WORKS / TEİAŞ
* 154 kV KADİRLİ OSB Substation / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / MUSTAFA TÜRKMEN-METİS ENERGY-DAB ARCHITECTURE
* 154 kV KALKAN SS / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / EUROPOWER ENERGY
* 154kV HABAŞ KARTAPE SINAİ SS (İZMİT-2) / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / SELÇUK ALBAYRAK 
* 154kV GÖLPAZARI SS / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / SELÇUK ALBAYRAK 
* 154kV GÖKTEPE RES SS - YALOVA RES TM / ALL PRIMARY-CONSTRUCTION AND STEEL PROJECT CONSTRUCTION WORKS / ABB
*ISTANBUL 4TH REGION - 12 SUBSTATIONS / PREPARATION OF FIRE PROTECTION PROJECTS / TEİAŞ
* İSTANBUL 4TH AND 20TH REGION - 9 SUBSTATIONS / PREPARATION OF FIRE PROTECTION PROJECTS / TEİAŞ
154 kV VAKFIKEBİR SS / CONSTRUCTION PROJECTS / GÜNGÖR ELECTRICITY
*154 kV KIZILIRMAK SS / ALL PRIMARY-CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS / GÜNGÖR ELECTRICITY
* 154 kV SİBEL WPP SS / ALL PRIMARY-CONSTRUCTION-STEEL-SECONDARY PROJECT CONSTRUCTION WORKS / ABB
* 154 kV TEKSIN SPP / ALL PRIMARY-CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS / ABB
* 154kV AKKUYU SS / SUBSTATION MV AND CONTROL BUILDING ENGINEERING WORKS / İÇTAŞ
* 154kV AKYAZI SS / CONSTRUCTION PROJECTS / KEBAN ENGINEERING
* 154kV ALMUS HES SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / EUROPOWER ENERGY
* 154kV BARHAL HAVZA SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / EUROPOWER ENERGY
* 154kV BOTAŞ SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / ACCESS ENGINEERING-DETAY ELECTRONICS
* 154kV ÇORLU SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / EUROPOWER ENERGY
* 154kV DAĞPAZARI RES SS / LINE FEEDER PROJECT DESIGN WORK / MYENERGY-FARUK ÇOBAN ENERGY
* 154kV DERECİK SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / EUROPOWER ENERGY
* 154kV DİYADİN SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / EUROPOWER ENERGY
* 154kV DÖRTYOL SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / EUROPOWER ENERGY
* 154kV ELEŞKİRT SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / SELÇUK BAY-DAB ARCHITECTURE BUSINESS PARTNERSHIP
* 154kV ERCİYES RES SS / ALL PRIMARY-CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS / ABB
* 154kV GEBKİM SS / ALL PRIMARY-CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS
* 154kV KIYIK SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / EUROPOWER ENERGY
* 154kV ÖZALP SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / ARMIN ELECTRICITY
* 154kV INDUSTRY (TAŞLICA) TM / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / MUSTAFA TÜRKMEN-METİS ENERGY
* 154kV TAYAKADIN WPP (FİNA) / POWER PLANT AND SWITCHYARD PRIMARY ELEK.VE CONSTRUCTION PRO.VE ETKB APPROVAL FILE / İSTRES 
* 154kV TURHAL SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / METİS ENERGY-SELÇUK ENERGY-CÜNEYİT KANDAŞOĞLU JOINT PARTNERSHIP
* 154kV ULU WPP / WIND PARK PROJECTS / ABB
* 154kV YALOVA WPP (FİNA) / PREPARATION OF POWER PLANT AND SWITCHYARD PRIMARY ELECTRICITY AND CONSTRUCTION PRO. AND ETKB APPROVAL FILE / YARES 
* 380-154kV DENİZLİ BATI SS / GIS SINGLE LINE DIAGRAM AND CALCULATIONS / ULUTAŞ 
* 380-154-33kV ÜRGÜP CAPACITOR SS (NEVŞEHİR) / MAKING STATIC CALCULATIONS / BEST ELECTRICITY
* 380-154kV BABAESKİ SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / NEXT ENERGY
* 380-154kV ATATÜRK (GAP) SS /ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / ARMIN ELECTRICITY
* 154kV KURŞUNLU SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / NEXT ENERGY
* BİSKA SPP SS / SECONDARY PROJECT / AGON POWER ENERGY
* HABAŞ BİLECİK SS / ALL PRIMARY-CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS / SELÇUK ALBAYRAK 
* SEYDİŞEHİR SS (CAPACITOR) / SINGLE LINE DIAGRAM AND CALCULATIONS / ULUTAŞ 
* 154kV BAĞLICA GIS / SINGLE LINE DIAGRAM AND CALCULATIONS / ULUTAŞ 
* 154kV ETLİK GIS / SINGLE LINE DIAGRAM AND CALCULATIONS / ULUTAŞ 
* 154kV HALKALI GIS / SINGLE LINE DIAGRAM AND CALCULATIONS / ULUTAŞ 
* 154kV MERSİN-I GIS SS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / EUROPOWER ENERGY
* TCCD-AAK YHT 6 SUBSTATIONS / ALL PRIMARY-CONSTRUCTION-FIRE-STEEL PROJECT CONSTRUCTION WORKS / CONSTRUCTION CENTER
* IRAQ-BAB AL TOP SS / BOB-ALTOP DM PROJECTS / BEST ELECTRICITY
* IRAQ-KALAR SS / CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS / SHANDZ
* NIGERIA 13 SUBSTATION / SUBSTATION PROJECTS AND EXPANSION WORKS / AK-AY ELECTRICITY
* SENEGAL-BAKEL SS / CONSTRUCTION AND STEEL PROJECT WORKS / KONTROLMATİK
* TANZANIA-TPS SS / DM PROJECTS / BUILDING CENTER
* AKSU MADENCİLİK SS / AKSA 110kV SUBSTATION STEEL PROJECT CONSTRUCTION / GÜNGÖR ELECTRICITY
* KOVANLIK HES SS / PROJECT SERVICE WORKS / ABB
* YARIMCA SS / STEEL CONST. PREPARATION OF PROJECTS / GIRISIM ELECTRICITY
* NEJRAB SS / PROJECT WORKS / KONTROLMATİK
* TANZANIA-MOROGOGO / RAILWAY ELECTRIFICATION PROJECT / BUILDING CENTER
* PORT SUDAN SS / PROJECT WORKS / KONTROLMATİK
* ÖRLEMİŞ HYBRID SPP-1 / ÖRLEMİŞ HYBRID SPP-1 (LOCATION-1) ON-SITE ROAD AND DRAINAGE PROJECT / GİRİŞİM ELECTRICITY
* ÇANTA RES / NETWORK CONNECTION CRITERIA OF PHOTOVOLTAIC PRODUCTION FACILITIES BASED ON WIND AND SOLAR ENERGY / KONTROLMATİK
* 30 Mwe SERTAVUL WPP / SUBSTATION PROJECT AND LICENSE WORKS / AKIN HOLDING 
* AKKÖPRÜ MECHANICAL WORKSHOP BUILDING / PROJECT / TEİAŞ GENERAL DIRECTORATE
* İKITELLİ WAREHOUSE BUILDING / PROJECT / TEİAŞ 1ST REGION
* ETİ MADEN (KIRKA) / PROJECT DESIGN / KONTROLMATİK

* MACEDONIA-DREN WPP SS / ALL PRIMARY-CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS / YEO ENERGY

* İÇDAŞ-KIZIK SS / PTL AND FINAL PROJECT SERVICES / İÇDAŞ
* İÇDAŞ-ŞUHUT SS / PTL AND FINAL PROJECT SERVICES / İÇDAŞ

* 154 kV ALPULLU, KARAMEHMET- EDİRNE SUBSTATIONS / ALL PRIMARY-CONSTRUCTION-STEEL PROJECT CONSTRUCTION WORKS / TCDD